Skid Supply & Installation

Supply and Installation of 2 Skids

Supply and Installation of 2 skids including MIMO:
HPO2 2″ Pressure control & flowmeter Manifold – U501HPN2 Flowmeter Manifold – U732

01.

year

2017

02.

client

Air Product

03.

Project Type

Supply and Installation of 2 skids includes MIMO

04.

Duration

~ 1 year

01. Materials

Supplying Materials for Ultra High Purity Oxygen Tubing
For the Ultra High Purity Oxygen (UHP) tubing section of the project, we took care of the complete supply of tubing materials. This included providing all the necessary tubes, fittings, flanges, gaskets, bolts, and nuts required for the installation.

02. Tubing

Efficient Tubing Supply, Fabrication, and Installation
We handled the supply, fabrication, and installation of the tubing for the project, covering approximately 200 meters of 3" - 1/4" High Purity tubing. Our skilled professionals carefully executed each step to ensure precise measurements, proper fitting, and secure installation.

03. Piping Support

Compliant Piping Support Design and Installation
To ensure the stability and integrity of the system, we designed, supplied, fabricated, and installed the required piping support in accordance with AP standards. Our team followed industry guidelines and best practices to create robust support structures that met the specific needs of the project.

04. Transport

Handled Materials with Care
Throughout the featured project, we took full responsibility for the receipt, storage, preservation, handling, and transport of all materials. Our experienced team ensured that materials were properly managed and maintained their integrity at every stage of the project.

05. Cleanout

Clean and Reliable Tubing
We followed strict procedures to conduct a thorough tubing cleanout, ensuring that all tubing used in the project was free from contaminants. By adhering to these procedures, we guaranteed reliable performance and minimized the risk of any issues.

06. Testing

Comprehensive Testing and Quality Assurance
We conducted non-destructive testing using various methods such as radiography, dye penetrant testing, and positive material identification. These rigorous testing procedures were carried out in accordance with established guidelines, ensuring that all systems met the required standards.

07. Pressure

Pressure Testing and Analytical Reports
To verify the strength and integrity of the systems, we performed pressure testing in accordance with the applicable procedures. Additionally, we provided comprehensive analytical tests and detailed reports, providing a clear understanding of the performance and quality of the completed project.

08. Valves

Precise Valve Tagging
Valves played a crucial role in system functionality and control. We ensured proper identification and organisation by tagging valves, making them easily accessible for maintenance and operation.

Get in Touch